Forester 2.5 i-S EyeSight e-BOXER Strong Hybrid
- Engine Type Horizontally-opposed, 4-cylinder, 4-stroke, petrol engine, DOHC 16-valve
- Maximum Output 165ps/5,600rpm
- Maximum Torque 21.6kgm/4,000-4,400rpm
- Electric Motor Max. Output 122PS
- Electric Motor Max. Torque 28.2kg
- Transmission Lineartronic





